- 1. The raw materials used in non-standard hardware stamping parts must meet the specified technical conditions, strictly check the specifications and grades of the raw materials, and conduct laboratory inspections on the workpieces with high dimensional accuracy and surface quality requirements.
- 2. The press and die and other tooling equipment used must be ensured to work in normal working conditions.
- 3. All links stipulated in the process regulations must be fully and strictly abided by.
- 4. During the stamping process, the mold cavity must be kept clean, and the orderly processed workpieces in the workplace must be placed neatly.
Link to this article:How to reduce metal stamping parts as waste
Reprint Statement: If there are no special instructions, all articles on this site are original. Please indicate the source for reprinting.:Cut Wiki,Thanks!^^